Introduction:
The main areas of emphasis for this course are structural vibration, failure analysis integration, analytical and test solutions, as follows: Main Goal: Provide an integrated, test-based, analytical method for resolving field vibration issues, with a focus on vibration problems in pipes. Secondary Goal: Establish a shared vocabulary that facilitates an understanding of what each party needs to know in order to address vibration concerns for the analyst and test engineer.
Course Objectives:
By the end of the course, participants will be able to:
· Do successful commissioning & start Up Operations
· Learn the technical strategy for bringing the plant from being a construction site to an operating plant
· Manage the shutdown, outage & turnaround for the plant facilities
· Develop a good plan for any critical isolation activities
Who Should Attend?
Personnel who should attend are:
- Operation Engineers who have oversight responsibility for Plant Commissioning, Start-up and shut down
- Maintenance Engineers with direct line responsibility as well as staff support responsibility for delivering on effective Plant Start-up & shutdown
- Plant Start-up and Commissioning Managers and Engineers
- Technical personnel & supervisors involved in supporting Plant Start-up & shutdown
Course Outlines:
Introduction to Start Up & Shutdown Operation and Methodology
- The startup Universal Process definition
- Terminology & Definitions
- Project life cycle
- Contracting Strategy
- Why to Effectively Manage Start-Up
- Avoiding start up delays & problems
- Start Up key dates
- Commissioning & start up flow process
- What Makes Commissioning and Plant Startup Difficult
Pre-commissioning & Mechanical Completion
- Organization & Roles
- Commissioning & Start up team organization & structure
- Startup task force responsibilities
- Commissioning & start up manger role
- Project planning & work breakdown structure
- The critical path method CPM
- Spare parts management process
- What is startup check list? & how to prepare a check list? Punch list preparation & filtering
- Inspecting pipe lines & plant facilities
- Commissioning tests & recommended practices
Shutdown / Turnaround Operations
- Introduction to Shut down and Turnaround Management
- The Shutdown Management Process
- Organization and Roles
- Plant Shutdown and Preparation for Maintenance
- Scope of Work Development and Work Breakdown Structures
- Preparation and Execution Issues
- Logistics, infrastructure and materials management
- Developing Shutdown and Turnaround Plans
- The Critical Path Planning Method
- Developing the overall Shutdown Plan
- Shut down Progress Monitoring and Control
Isolation & Critical Activities
- Types of Isolation
- Mechanical & Electrical isolation
- Isolation standards & techniques
- Documents necessary prior starting the plant isolation
- Confined space Entry requirements
- Pigging & smart pigging prior plant start up
Start-up & Initial Operation
- Utilities start up
- Process units start up
- Sources of problems during the startup operations
- Hazards associated with the startup operation
- Risks or Startup Faults
- Performance & acceptance testing
- Closed-Out Certificates
- Lining up the Plant facilities
- Coordination and Supervision during Start-up